Action A1: Technical preparation of the feedstock collection system and of plant installation
- Deliverable A.1.2.R Description of the feedstock collection supply system
- Deliverable A.1.2. Description of the feedstock supply collection system
Action C1: Design and installation of the biorefinery system and of the control & monitoring system
Action C2: Test operation and optimization of the biorefinery system
- Deliverable C.2.1. Experimental protocol and Laboratory Analytical Procedure
Action C3: Performance evaluation of fuel mixes with the produced ethanol in motor engines
Action C4: Economic feasibility study
Action C5: Development of the CIRCforBIO online platform
Action C6: Demonstration of the innovative biorefinery system through circular economy living labs
Action C7: Replicability and transferability
Action D1: Monitoring and evaluation of the project impact
- Deliverable D.1.1. First report on the monitoring and evaluation of the project performance indicators
- Deliverable D.1.1.+ Completion of the Monitoring Protocol
- Deliverable D.1.2. Second report on the monitoring and evaluation of the project performance indicators
Action E1: Project website, online social networking, notice boards and Layman’ s report
- Deliverable E.1.1. Photos from the installed notice boards (8) at the premises of the project partners
- Deliverable E.1.2. Photos from Installed Notice Boards (2) at the site of the demonstration system
Action E2: Networking with other LIFE and/or non-LIFE projects
Action E3: Informative material, technical publications/presentations and media work
- Deliverable E.3.1. Communication and visibility strategy
- Deliverable E.3.2. Roll-up banners (English version, Greek version)
- Deliverable E.3.3. 1st Newsletter
- Deliverable E.3.4. 1st Leaflet (English version, Greek version)
- Deliverable E.3.5. 2nd Newsletter
- Deliverable E.3.7. A 360 interactive remote presence 3D video to perform virtual tours to the living lab at LTCP in Greece
- Deliverable E.3.8. 3rd Newsletter
- Deliverable E.3.10. 4th Newsletter
- Deliverable Ε.3.11. 5th Newsletter
- Deliverable E.3.15. Three technical publications
Action E4: Organization of events, workshops, training seminars and conferences
- Deliverable E.4.1. Minutes of the Launching Event
Action F1: Project management
- Deliverable F.1.1. Minutes of the kick-off meeting
- Deliverable F.1.2. Project management plan
- Deliverable F.1.3. Definition of green procurement practices
Action F2: After-LIFE Plan