Action A1: Technical preparation of the feedstock collection system and of plant installation
- Deliverable A.1.2.R Description of the feedstock collection supply system
- Deliverable A.1.2. Description of the feedstock supply collection system
Action C1: Design and installation of the biorefinery system and of the control & monitoring system
- Deliverable C.1.1 Facility operation and maintenance manual
Action C2: Test operation and optimization of the biorefinery system
- Deliverable C.2.1. Experimental protocol and Laboratory Analytical Procedure
- Deliverable C.2.2 Report on the test operation and optimization of the biorefinery system
Action C3: Performance evaluation of fuel mixes with the produced ethanol in motor engines
- Deliverable C.3.1 Report on Physicochemical Properties of EtOH-gasoline Blends, Impact on Engine Performance and Emissions Characteristics
Action C4: Economic feasibility study
- Deliverable C.4.1 Economic feasibility study
Action C5: Development of the CIRCforBIO online platform
- Deliverable C.5.1 Platform user guide
Action C6: Demonstration of the innovative biorefinery system through circular economy living labs
- Deliverable C.6.1 Report on the demonstration action and on the evaluation of its results
Action C7: Replicability and transferability
- Deliverable C.7.1 List of partners interested in implementation of the CIRCforBIO circular economy concept for biomass management
- Deliverable C.7.2 Replication and transfer strategy
- Deliverable C.7.3 Business and exploitation plan
- Deliverable C.7.4 Policy proposal
- Deliverable C.7.5 Guidelines for ecolabelling bioethanol
- Deliverable C.7.6 Cooperation agreement(s) signed for the implementation of the CIRCforBIO circular economy concept for biomass management
Action D1: Monitoring and evaluation of the project impact
- Deliverable D.1.1. First report on the monitoring and evaluation of the project performance indicators
- Deliverable D.1.1.+ Completion of the Monitoring Protocol
- Deliverable D.1.2. Second report on the monitoring and evaluation of the project performance indicators
- Deliverable D.1.3 Third report on the monitoring and evaluation of the project performance indicators
- Deliverable D.1.4 Fourth report on the monitoring and evaluation of the project performance indicators
- Deliverable D.1.5 Life Cycle Analysis (environmental indicators)
- Deliverable D.1.6 Report on the assessment of the project socioeconomic impact (socio-economic indicators)
Action E1: Project website, online social networking, notice boards and Layman’ s report
- Deliverable E.1.1. Photos from the installed notice boards (8) at the premises of the project partners
- Deliverable E.1.2. Photos from Installed Notice Boards (2) at the site of the demonstration system
- Deliverable E.1.3 Layman’s report
Action E2: Networking with other LIFE and/or non-LIFE projects
Action E3: Informative material, technical publications/presentations and media work
- Deliverable E.3.1. Communication and visibility strategy
- Deliverable E.3.2. Roll-up banners (English version, Greek version)
- Deliverable E.3.3. 1st Newsletter
- Deliverable E.3.4. 1st Leaflet (English version, Greek version)
- Deliverable E.3.5. 2nd Newsletter
- Deliverable E.3.6 Waterproof stickers (NTUA car running with mixtures of the produced bio-ethanol)
- Deliverable E.3.7. A 360 interactive remote presence 3D video to perform virtual tours to the living lab at LTCP in Greece
- Deliverable E.3.8. 3rd Newsletter
- Deliverable E.3.10. 4th Newsletter
- Deliverable Ε.3.11. 5th Newsletter
- Deliverable Ε.3.13. 6th Newsletter
- Deliverable E.3.15. Three technical publications
- Deliverable E.3.16 Presentations from the participation in other conferences
- Deliverable E.3.17 Ten press releases
- Deliverable E.3.18 Five announcements to radio and television stations
- Deliverable E.3.19 Five press articles
- Deliverable E.3.20 Two posters
Action E4: Organization of events, workshops, training seminars and conferences
- Deliverable E.4.1. Minutes of the Launching Event
- Deliverable E.4.2 Minutes of the demonstration events at the living lab at LTCP
- Deliverable E.4.3 Proceedings of the international conference
Action F1: Project management
- Deliverable F.1.1. Minutes of the kick-off meeting
- Deliverable F.1.2. Project management plan
- Deliverable F.1.3. Definition of green procurement practices
- Deliverable F.1.4 Implemented green procurement practices
- Deliverable F.1.5 Final synthesis report on the stakeholder engagement strategy and communication plan
- Deliverable F.1.6 Minutes of the technical committee meetings
- Deliverable F.1.7 Minutes of the management committee meetings
- Deliverable F.1.8 Minutes of the steering committee meetings
Action F2: After-LIFE Plan
- Deliverable F.2.1 After-LIFE plan
- Deliverable Layman’s Report Layman’s Report